Emergency Department Expansion

 

Project Bulletin SMC

  • ┬áLocation:
    • Stillwater Medical Center
    • Stillwater, Oklahoma
  • Owner:
    • City of Stillwater
  • Project Size:
    • 30,000 sf
  • Completion Year:
    • 2002
  • Construction Cost:
    • $12M
  • Owner Contact:
    • Steven Taylor
    • Director of Facilities
    • Stillwater Medical Center
    • 405-742-5645
    • staylor@stillwater-medical.org

 

ED/A provided MEP design services for a large addition to the existing Stillwater Medical Center. The project required a large expansion to the west side of the hospital. Of major importance was continuity of care within the Emergency Department, because of around the clock use, and interruption of services was not a possibility.

Through planning and design, the department was able to maintain its full use and schedule throughout the construction process. ED/A has designed numerous projects for Stillwater Medical Center since 2000.

 